Preliminary Site Investigation – Campground Development, Mid-Coast NSW

OVERVIEW

Contaminated Land Assessment for Proposed Campground Development

Confluence Environmental completed a Preliminary Site Investigation (PSI) at a former go-kart facility on the NSW Mid-Coast in August 2026 to support a Development Application for a proposed campground accommodating up to 44 caravans, campervans and tents.

The investigation covered approximately 1.4 hectares and included a review of historical land uses, a site inspection and intrusive soil sampling across nine locations, comprising six hand-auger boreholes and three shallow test pits. A total of 10 primary soil samples were submitted for laboratory analysis of contaminants including petroleum hydrocarbons, heavy metals, BTEX, PAHs and phenols, with additional targeted testing for asbestos and coal tar.

PROJECT SCOPE

The assessment focused on potential contamination associated with the site's historical use as a go-kart facility, including workshop operations, fuel storage, a former underground petroleum storage system and localised areas of imported fill.

Fieldwork included soil sampling to depths of approximately 0.5 m, supported by laboratory analysis, historical aerial photography, regulatory database searches and development of a preliminary Conceptual Site Model (CSM).

KEY FINDINGS

Analytical results for shallow soils were below the adopted human health and ecological investigation criteria, with no evidence of widespread shallow soil contamination within the areas investigated.

The investigation also identified potential residual petroleum contamination associated with the former underground fuel tank, requiring further assessment of deeper soils and potentially groundwater.

Confluence concluded that the site could be made suitable for the proposed campground development, subject to supplementary investigation and appropriate management of the identified contamination risks.

The assessment provided the project team with an understanding of the site's contamination constraints and a clear pathway for progressing the proposed development.